|
|
![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() |
|
![]() |
![]() |
|
|
|
||
|
|
Our Projects“The Blue Bird” jazz clubLocation: Moscow Completion date: 10.01.2002 The experts of I.S.P.A.-Engineering joined the works at the stage of building. The acoustic design was carried out based on existing construction documentation provided the adaptation of audio system to architectural features of the premises. For high quality and uniform sound field during the live jazz concerts the chamber hall (100 sq.m) was equipped with Meyer Sound UPA / UPM / UMS series compact active speakers, and the distributed installation method was implemented. The project was executed in 5 months. Return to the list of projects |
|
© 2007 |
Company information | Press-center | Contacts | Developed by: |